Sunday Workday

Lovely workday and loads done.

We cleared the new path of trees and really started to connect the two clearings. We are going to remove all the scrub either side of the bridge and really make it the feature that it deserves to be.

Clearing the path.

We Just need to keep clearing this section so that the whole bit that is in the cutting can get some sunlight and dry out a bit.

Stumps!!

We left a lot of tree stumps and the plan is to chainsaw these to ground level and then drill a hole into the top and drip some Roundup Tree Stump and Root Killer in to kill the roots.

Next workday is on Tuesday 20th November at 10:30  in the same place pushing back more of the scrub. Hopefully we can rekindle the bonfire and really get going with it. After that we are back on it on Sunday 25th November at 2:45pm

Thanks to all who made it on Sunday – about six or so – many hands make light work!!

Paul

Advertisements
This entry was posted in Newsreel. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s