Big Plans For Autumn..

Today it was Aaron, Mick and me and we worked the path clear from the new underpass, to close to The Bear pub.

We have a real problem with drainage on this section due to the 19th century drains being damaged when the contractors put in the underpass.

However, we have a huge south-facing bank that is begging to be cleared of scrub and wild flowers allowed to grow.

Various shots of the section. We need to take the trees out on the north side of the path and then clear the bank on the south side. This is going to mean a lot of tree chopping and bonfires to get rid of the brash.

This area has the potential to be fantastic. Loads of water and loads of sunshine. I am so excited for the plans we have for this bit.

Next workday is Monday next week at 9am, on this section.

Paul

Advertisements
This entry was posted in Newsreel. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s